Land at Highover Farm, Hitchin

David Wilson Homes

April 2025 Update - 25/00076/DOC - Site Wide Phasing

The Site Wide Phasing and Delivery Plan sets out the broad sequence of implementation for the following elements:

  1. Residential development parcels;
  2. Location of self-build plots;
  3. A programme for the delivery of public transport infrastructure;
  4. Major distributor roads/routes within the site, including timing of provision and opening of access points into the site;
  5. Strategic footpaths and cycleways;
  6. Community/neighbourhood centre facilities;
  7. Strategic foul and surface water features and SUDS;
  8. Formal and informal public open space, park/square, allotments, parks, NEAP and LEAP;
  9. Strategic/structural landscaping;
  10. Strategic electricity, telecommunications and gas networks;
  11. Infrastructure for the provision of fibre optic cables;
  12. Environmental mitigation measures;
  13. Off-site highway improvements;

The Strategic Infrastructure application forms the first phase of this plan, following which, it is proposed to progress with the Phase 1 residential development, the area of which is shown on this page.

Indicative Phase 1 Residential Area